Portal de La Union

www.portaldelaunion.com

La Union - SpanishLa Union - English
detail of La Union

 

The Community initiates the process of holding the competition to build the new port of Portman (24/06/2015)

The Minister of Development, Public Works and Planning in functions, Francisco Barnabas, said at a press conference that was submitted for public consultation, by a notice in the Official Gazette of the Region of Murcia (BORM), feasibility study building by public works concession, Marina Bay Portman and in particular alternative called 2-Bis.

Bernabe said that this project "is closely linked to the regeneration of the bay, the specifications for the award of the work of regeneration approved last Friday by the Council of Ministers, and is a new manifestation of the determination of return that space neighbors and citizens in general, and turn it into a tourist reference for the Mediterranean, it is absolutely firm for the Government of the Region of Murcia ".

The acting head of Development said that "under the project, which will cost 48.3 million euros, the new port of Portman Bay generate a sheltered space, on the west side of the cove, which allow the berthing 815 vessels, thus recovering the traditional site of the port. The idea is that the Romans called Portus Magnus (Puerto Grande) it again be in every sense of the word. "

"The port also include user services to ensure proper functioning, as dock, captain, yacht club, restaurants and commercial buildings, access roads, parking, green areas, pedestrian walkways, etc., contributing so crucial to the recovery of an area of ​​great beauty and undeniable appeal in the Murcia coast, which will generate jobs and wealth for the town and the region in a sustainable and respectful with the environment, "Barnabas said.

Under the bill, on the central quay buildings and commercial premises nautical club, restaurant and 221 parking spaces are located, while the perpendicular to the central pier or dock this, an additional 1,500 square meters will feature a Free commercial restoration and public access and other 479 parking spaces.

A pedestrian promenade runs all the way around the port, from the start until the start contradique breakwater, with a length of 2 kilometers.

The total area is 39,000 berths square meters, and includes 171 berths of the fishing pier and traditional uses, to be located in the Old Port area and will enable the transfer there of vessels currently using the small The Cove Street, in the east end of the bay.

The breakwater of the port, with a length of 203 meters, starts from the tip of Portman and features curved.

The main mantle of the sea side of the dam will consist of cubic concrete blocks of eight tons, arranged on a filter layer breakwater between 400 and 750 kilos.

Processing Project

Last April, the Directorate General of Environment reported favorably on the project, and in May, the Directorate General for Transport, coasts and ports forwarded in writing to the Coasts of Murcia for the secondment procedure was initiated maritime-terrestrial public domain to the Autonomous Community to make possible the development.

Since it is a public works concession, as provided in the Law on Public Sector, has drafted a feasibility study Alternative 2-Bis, "that must now subject to public information within 20 days "outlined Barnabas.

The documentation will be exposed to the public at the Department of Public Works and Planning for the time indicated, computed from tomorrow, during which will be considered by those who wish, during office hours to citizens, in order to make the comments they deem relevant.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información