The company Acciona told the City Council on Thursday October 2, starting at 8.00 am and lasting approximately eight hours shall be suspended the supply of drinking water in the village of Roche as a result of the improvement works in network being made by it.
The court is due to deleting the old lanecesidad deFibrocemento network currently supplied to the village and runs along the site's walls to ancient deposits existing regulation and currently unused.
After cutting the connection of general network suministroque elapses the margin of the regional road F-41 with the existing mains in Avenida La Libertad will occur.
Connection will be made with pipe High Density Polyethylene and nominal diameter of 200 mm, which will remove the existing hydraulic losses in the current pipeline of Slate, plus it is expected that effective pressures increase, leading to improved service and increased hydraulic performance .
Once completed action will proceed to restore the normal supply, begging apologies to the residents affected by the cut.
Source: Ayuntamiento de La Unión