Portal de La Union

www.portaldelaunion.com

La Union - SpanishLa Union - English
detail of La Union

 

Performing renewal sanitation Ramon Perello Street and adjacent (30/07/2014)

The sewage Street Ramon Perello and the stretch of San Vicente Street to the intersection with Street Hoyos are redesantiguas of mass concrete pipe in a state of structural weakness that caused fugasen network and its collapse.

The action that is performed on these roads is as follows:

- The renovation of the existing network of sanitation on Calle Ramon Perello with the addition of a new PVC sewer diameter 315 mm SN-8 from the well located at the gateway to Maria Salcedo Cegarra to the well Institute in intersection with Main Street.

Approximately 50 ml.

- Renovating rush home sanitation.

Three units.

Running manholes.

- The renewal integralde sanitation in the Calle San Vicente with 315 mm diameter PVC S-8 of approximately 25 ml.

- Renovating rush home sanitation.

Three units.

Running manholes.

- Renovation of the existing bodies stormwater drain at the intersection with Main Street Street Ramon Perello.

Running manhole existing network storm on Main Street.

The work being done are framed within the daily activities of conservation, restoration, maintenance, etc., The Supply and Sewerage Service has an obligation to develop within the contractual framework.

Thus, this project is borne by the corporation Acciona and is part of the Investment Plan to be undertaken in the town during the first 2 years of duration of the contract, amounting to more than 1'1 million.

Source: Ayuntamiento de La Unión

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información