Were carried out the renovation of networks of drinking water and sanitation in the slum made called White Flats, whose main features are:
The works are framed within the contractual obligations that the dealership must perform in the ordinary course of the water service.
The initial state of the networks of water supply was obsolete with iron pipes with large pockets of hydraulic losses.
Domiciliary counters were located mostly inside the galleries of the houses with the consequent problem of taking readings, handling control counters, etc..
Existence rush lead.
The drainage network of the existing pedestrian was in a sorry state urging its renewal.
In response, the Service adopted the following policy measures:
comprehensive renewal of the network of drinking water from two blocks of existing buildings where 97 homes have been detected.
comprehensive renewal of the general rush to each building-staircase-implanting new batteries accountants in public domain for proper control and decision read.
enforcement of domestic connections.
comprehensive renewal of sanitation Street St. Cyrilla.
This renovation involved replacing all existing pavement at Santa Cyrilla.
In summary it should be noted the most significant measures of performance:
linear feet of supply network renewed = 180 m
meters of network renewed sanitation = 55.5 m
No manholes and manholes sanitation = 4 wells and 6 manholes rush sanitation record storm manholes and 2 record.
Number of household = 12 and 1 individual battery connections.
Total 97 counters.
deaceras m2 renovated, central street = 210 m2
These works are framed in ordinary renovation of networks and connections that the dealer hits included in the cost of service and execution are bound by the dealership.
The estimated cost of the works is 70,000 euros (VAT included).
Source: Ayuntamiento de La Unión