Portal de La Union

www.portaldelaunion.com

La Union - SpanishLa Union - English
detail of La Union

 

The UNION PSOE presented allegations to environmental sustainability report Gorguel (16/06/2013)

Mariano Oliver, Secretary General, said "we have made claims environmental sustainability report Gorguel because we believe it is consistent with the position that we have been maintaining since 2006, in the sense that it is necessary to find a location container terminal Creek not Gorguel or any other location that may endanger the draft environmental adaptation of Portman Bay and the Sierra Minera regeneration ".

Oliver said: "We therefore request the removal of such an alternative, or otherwise, of the entire Master Plan, and the search for a new location in the coastal coastline of the Region of Murcia, that does not hamper the implementation of a project and is prepared and approved as the regeneration of Portman Bay, which should become an important socio-economic engine of the region and the region of Murcia. "

Unionense Socialist spokesman said that "in our arguments we show the impossibility of cohabiting both projects, and emphasize the important and serious repercussions and conditions of visual and environmental character terminal Gorguel contenders for the project would Portman regeneration. "

Thus, Oliver added, "the execution of the container terminal in the Gorguel would have a visual impact on the basin of Portman Bay, that would absolutely void for the intended use in the proceedings of regeneration, which are residential use , tourism, environmental and leisure from a sustainable point of view. The terminal groins, hundreds of meters long, and with a considerable height above sea level, subtract capacity to the "viewshed" Bay Portman, who will definitely lose, on its right bank, the possibility of ocean horizon, this being replaced by concrete horizon that will mean the levees. From the environmental standpoint, the implications for Natura 2000, SACs and SPAs existing the area are obvious and significant. "

Oliver warned that "The geographic proximity of both actions, motivates the individual treatment of each of them is impractical, since the conditions on the seabed, on environmental habitat nearby, on the demand for road and rail infrastructure and the actual landscape impact area can be of some actions on other, and let each incompatible or have important conditions for the incorporation of the other. therefore not understood at all, and is considered therefore feasible, the possibility of implementing the new harbor of Cartagena Gorguel without having undertaken a strategic plan for the region, and a study of integrated management of the coastal zone. "

Finally, the Socialist spokesman unionense recalled that "the document subject to public information, silences and ignores the existence of 3-3-2010 Resolution of the Directorate General of Fine Arts and Cultural Heritage of the Autonomous Community Murcia (BORM n ° 67 of 23-3-2010), to initiate the record for the well cataloged statement for its cultural significance in favor of the archaeological beach in Cartagena Gorguel ".

Source: PSOE La Unión

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información